Media Coverage

From sketch to production: a 120-day product development case at ZEERIN


How long does a desktop digital accessory take from a hand sketch to rolling off the line? Under an integrated model, ZEERIN's answer is 120 days.

Days 1-15: market and competitor analysis, product positioning, size and price band, then three concept directions for the customer to choose from. Days 16-35: final concept, 3D modelling and renderings, in parallel with structural stacking and PCB solution assessment.

Days 36-60: structural design and DFM review, CNC cosmetic prototypes, assembly validation and hand-feel evaluation, with structural details revised from prototype findings. Days 61-85: tooling, trial shots and mould correction, first-article approval and frozen moulding parameters.

Days 86-120: moulding, surface finishing, assembly, aging test, packing and shipment. One project team follows the whole path, so feedback between design and manufacturing is measured in days rather than weeks.

The article points out that time is not compressed inside any single step - it is saved between the steps. That is the most concrete value of design plus manufacturing under one roof.

← Back to news

Core Services

Contact

Room 206, Yuanlaixi Technology Building, Songgang Street, Bao'an District, Shenzhen, China
info@izeerin.com
86-0755-29985117